Communications Solutions we Provide
Fiber Optics
- Fusion Splicing
- Testing
- Maintenance
Coaxial Cable
- Activation
- Coaxial Splicing
- Emergency repairs
- Maintenance
- Pushing through conduit
Path of Fiber or Coaxial Cable
Underground
- Trenching
- Mini excavator for jobs requiring digging through rocks or to a depth of more than 3 feet.
- Ride-on trenchers for jobs over 200ft.
- Walk-behind trenchers for jobs between 20ft and 200ft.
- Any job less than 20ft would be manual labor.
- Pneumatic Boring Missile
- Instead of tearing up the asphalt, we would bore under it if possible.
Aerial
- Aerial Linework
- Bucket trucks for poles that have street access.
- Should the pole not have street access we have the equipment nessecary to climb or put a ladder up to reach the poles.